Waste incinerator C300
high-capacity

Waste incinerator - C300 - Addfield Environmental Systems Limited - high-capacity
Waste incinerator - C300 - Addfield Environmental Systems Limited - high-capacity
Waste incinerator - C300 - Addfield Environmental Systems Limited - high-capacity - image - 2
Waste incinerator - C300 - Addfield Environmental Systems Limited - high-capacity - image - 3
Waste incinerator - C300 - Addfield Environmental Systems Limited - high-capacity - image - 4
Waste incinerator - C300 - Addfield Environmental Systems Limited - high-capacity - image - 5
Add to favorites
Compare this product
 

Characteristics

Applications
for waste
Other characteristics
high-capacity
Productivity

300 kg/h
(661 lb/h)

Description

The Addfield C300 is a modern hospital waste incinerator designed to burn solid waste in a clean and environmentally safe manner. Using the pyrolytic principles of combustion, the C300 model has been specifically design for burning clinical waste from hospitals and research centres at a rate of up to 300kg/hr. The machine is equipped with the necessary control systems, a primary and secondary after chamber with a two second residue time. The machine is available with an automatic bin tipper system, automatic ram charging system, vertical opening door, automatic de-ashing and gas cleaning equipment to satisfy the most stringent environmental standards. The primary combustion chamber arrangement is a multiple stepped hearth refractory, with waste loading taking place at the highest level. Each hearth has an evacuation ram to manoeuvre the residue through the chamber and finally into the ash treatment zone. This design enables continuous operation during a 24 hour period with automatic ash removal during the cycle. Only with this stepped hearth arrangement can a high capacity burn process happen. The movement of waste throughout the machine removes any potential cold spots, agitated the waste and allowing for an immensely high combustion efficiency. Manufactured in Britain, to an extremely high standard, the machine uses heavy gauge steel work and a multi-layers brick lined refractory for maximum efficiency. The C300 machine is suitable large hospitals. The machine would be able to service the equivalent of 2900-7200 beds. Depending on its geographical location as waste generation rates vary from country-to-country. Please contact us for more specific information.

Catalogs

No catalogs are available for this product.

See all of Addfield Environmental Systems Limited‘s catalogs
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.