WELL-CONCEIVED MODULAR PRINCIPLE
Customers and prospective buyers who are familiar with the benefits of a stationary plant will appreciate the variable options offered by the well-conceived modular principle. Most modern designs that are tailored to the needs of users, are joined together to form a modern plant. A galvanized design of maximum corrosion protection and high-quality components make the CBS Elba to a premium concrete mixing plant.
In the construction of the new concrete plant CBS Elba was great value placed on competitive transportation costs. This was achieved by pre-installed modules.
LINEAR PLANT WITH BELT-CONVEYED FEEDING
Customers like to use the conditional by the design higher hourly output of belt-conveyed feeding plant. The floor space required for this, may differ on the local situation which can have a positive impact on the overall design. Difficult conditions can be realized thereby.
Thanks to the mounted pre-hopper on top of the mixer on a belt-conveyed plant, the production output for standard concrete are possible from 114 m³/h up to 161 m³/h.
MAXIMUM MIXER SELECTION
Single-shaft or twin-shaft mixer of the type CEM S Elba or CEM T Elba with a volume of 2,0 m³ to 3,5 m³ hardened concrete per batch can be installed variably, depending on the machine size. The already generously dimensioned walkability can be optionally by a wide range of different maintenance and inspection variants extended. The pre-installed weighing module with cement and water weigher and the pre-hopper for aggregates can be completed if necessary with additional required scales as option.