Buildings, high buildings, business and shopping centers, subway underground stations, industrial structures, energy facilities, hospital health facilities, viaducts, bridge projets, HEPP projects and etc. used in projects.
Scaffolding system used especially in high and thick slabs.
H Stacking scaffolding elements; It consists of two elements: top and bottom chassis and H Stacking elements.
Above the bottom chassis H Stacking elements are placed in a tower form with human power.
Tower intervals can be adjusted according to the slab loads.
Plywood is supported with H20 wood beams or 10/10 wood.
The main girder H20 wooden beams are placed on adjustable spindle cross heads or 10/10 wood are placed on adjustable spindle U-heads.
The towers are supported by diagonal elements to strengthen against slab thickness, height and wind loads.
It can be transported as a tower without being disassembled by connecting the top and bottom chassis elements by crane.
50kN / foot has high carrying capacity.