• Products
  • Catalogs
  • News & Trends
  • Exhibitions

Mobile scaffolding
facadewith stairway

Mobile scaffolding - ASYAPI scaffolding - facade / with stairway
Mobile scaffolding - ASYAPI scaffolding - facade / with stairway
Mobile scaffolding - ASYAPI scaffolding - facade / with stairway - image - 2
Mobile scaffolding - ASYAPI scaffolding - facade / with stairway - image - 3
Mobile scaffolding - ASYAPI scaffolding - facade / with stairway - image - 4
Mobile scaffolding - ASYAPI scaffolding - facade / with stairway - image - 5
Mobile scaffolding - ASYAPI scaffolding - facade / with stairway - image - 6
Add to favorites
Compare this product
 

Characteristics

Type
mobile
Applications
facade
Other characteristics
with stairway

Description

Buildings, high buildings, business and shopping centers, subway underground stations, industrial structures, energy facilities, hospital health facilities, viaducts, bridges, culverts, HEPP projects, shipyards, stage and events platforms etc. used in projects. Scaffolding system used in different heights. Elements consist of vertical and horizontal elements in different lengths. The flange spacings of vertical elements are manufactured as 50 and 100 cm as standard. It can be combined with 8 horizontal elements, 90 ° four and 45 ° four from a single connection point. Horizontal elements are manufactured in different sizes according to the slab loads. Can be used as an alternative facade scaffoldings. Stairs and railing elements can be placed between the elements and can be used as bases or as security stairs in the building ceiling. Elements can be used as mobile work scaffolding. Plywood is supported with H20 wooden beam or 10/10 wood on the grid according to H20 wooden beams and slab loads in the woods. Main girders H20 wood beam are placed on the cross-heads or 10/10 wood are placed on U-heads. The slab is supported by diagonal elements to strengthen against the thickness, height and wind loads. Vertical and horizontal elements can be easily dismantled and installed by placing them with hammer aid and human power. High load carrying capacity due to node points. If the vertical elements are connected with 100cm intermediate horizontal elements, they have a carrying capacity of 40kN / leg.
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.