High buildings, business and shopping centers, metro underground stations, industrial structures, energy facilities, hospital medical facilities, retaining walls, isolation screens, HEPP projects, dam bodies etc. used in projects.
The wall panels can not be placed on the other sides of the wall formworks and can not be connected with the tie-rod.
The steel support elements are supported by the tie-rods that have been previously buried in concrete and connected to the tie-rods or detachable conical concrete bolts.
The fresh concrete from the casting is conveyed to the anchors buried in concrete with the pressure props.
Intermediate distances of steel support elements are determined according to the height of the concrete and the fresh concrete pressure connected to it.
Two different types are designed according to concrete height and thickness.
Type 1, hmax = 350cm.
Type 2 is hmax = 600cm.
Fast manufacturing is possible with the help of crane.