Steam Turbine
BPEG has started the development and designing of feed water pump steam turbine since 1983, and has formed the series of products to equip 200MW to 600MW units. The first steam turbine was put into operation in Shanghai Shidongkou Power Plant in 1987. Currently we have approximately 500 sets of turbines under operation domestically, and are well known for high market share and well customer acceptance. Besides typical feed-water pump turbine, we can also design according to customers' requirements.
TGQ type turbine adopt design of single chamber, impulse type, dual steam supply, variable speed, condensing type. The product has the advantages of light in quality, small axial thrust force, adaptive to quick load change, and little leakage in blade tip and shaft seal. Meanwhile, utilization of inner-switch of steam supply, and nozzle controlling system enable more reliable operation, as well as more smooth switching of steam supply.
Since 2018, BPEG has been cooperating with Beijing 4D Power on power generation turbines for under 100MW biomass, garbage, and waste-heat power plants.