Bridge construction launching gantry SLG

Bridge construction launching gantry - SLG - CIMOLAI TECHNOLOGY SpA
Bridge construction launching gantry - SLG - CIMOLAI TECHNOLOGY SpA
Bridge construction launching gantry - SLG - CIMOLAI TECHNOLOGY SpA - image - 2
Bridge construction launching gantry - SLG - CIMOLAI TECHNOLOGY SpA - image - 3
Bridge construction launching gantry - SLG - CIMOLAI TECHNOLOGY SpA - image - 4
Bridge construction launching gantry - SLG - CIMOLAI TECHNOLOGY SpA - image - 5
Bridge construction launching gantry - SLG - CIMOLAI TECHNOLOGY SpA - image - 6
Add to favorites
Compare this product
 

Characteristics

Domain
for bridge construction

Description

Segment launching gantry to lift and launch precast elements used for the construction of the Nouvelle Route Du Littoral, Réunion. Total length: 280 m Maximum launching: 123.5 m Number of main winch trolleys: 2 Maximum capacity of each main winch trolley: 308 t Maximum weight of the element positioned with two main winch trolleys: 550 t Number of hanging elements at span end: 5 Total weight of hanging elements at span end: 1372.2 t Total weight of the hanging elements during cantilever construction: 22 Number of elements launched daily: 4

Catalogs

No catalogs are available for this product.

See all of CIMOLAI TECHNOLOGY SpA‘s catalogs

Other CIMOLAI TECHNOLOGY SpA products

Civil

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.