Bar production plant TTK 1000
for profiles

bar production plant
bar production plant
bar production plant
bar production plant
Add to favorites
Compare this product
 

Characteristics

Product applications
for bars, for profiles

Description

Number of operators: 3 Output: 90/110 bars/h Max bar processing length: 7.5 m The TTK 1000 is particularly suitable for medium-high outputs. The motorised transfer between the 2 knurling machines and the unloading storage unit downstream of the assembly machine minimise manual handling of profiles by the operators. The suggested layout minimises the spaces required while also optimising the labour necessary for continuous operation of the plant. Production steps: 1 - Knurling of thermal strip bar seat on first profile and thermal strip bar insertion via special grippers at knurling machine exit. Knurling of second profile. Composition of two halves. 2 - Fixing of two halves and thermal strip bars via gradual pressure of the discs on the profile hammers. 3 - Performance of shear strenght test on sample 100 mm long to test assembly quality. Plant composition: • Loading roller ways 2.4 m • TAB 101 or as alternative TAB 100 or TAB 100 M • Double modular transfer • TAB 200 or as alternative TAB 200 M • Double modular storage unit • TAB 400 or as alternative TAB 400 M

VIDEO

Catalogs

TTK 1000
TTK 1000
2 Pages
Related Searches
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.