DAHAN PT6013 Topless Tower Crane
Jib Length: 60m
Max. Load: 6T
Load at Jib end: 1.3T
Mast sections: L46A1 or 1.6*1.6*2.8m Mast sections
Advantage:
1. The installation of the platform for counter jib is very convenient. When installing, there is a pin underneath, there is a semicircular hole, put the pin in the semicircular hole, turn up, there is a pin hole on it, you can install it directly with a pin. Installation is very convenient.
2. Under the slewing table, there is pin bracket for the connection of counter jib and slewing table, which is very convenient and safety for installing. And the installation of the slewing table platform, the installation method is similar to counter jib platform, there is pin placed in the semicircular hole underneath, up here inserted the pins directly, very convenient for installation.
3. The weight sensor, which can realize double protection, which is realized by electronic control and mechanical safety device.
4. The pulley adopts a quick installation method, which avoids the previous situation that the shaft sleeve is inside the pulley lug, and can be easily installed by one person.
5. For the node of the hoisting jib, there is bolt hole in this position, and the bolt is placed in this position during transportation. The lower chord and end face of the hoisting jib, its positioning pin holes and bolt holes, and this end face are all processed after welding, so that after installation, it is very straight, without gaps, and very flat.
6. The cabin adopts a sunken cabin design, the cabin plane sinks, which can broaden the driver's field of vision. There is a pin bracket for the hoisting jib pin, which is very safety to install.