E-Berk has a Research and Development (R&D) Center to focus to design and manufacture of complete TBM Systems. The center’s studies have resulted in an indigenously developed and manufactured E-BERK’s product TBM E-3301 named “Anadolu” in 2017. Anadolu being the first TBM of Turkey has been in use successfully since May 2017 in Ergene Deep Discharge Waste Water Transmission Tunnel Project of Turkey. Anadolu TBM has CE markings with a diameter of 3250mm. Currently, TBM manufacturing capacity of E-BERK in different types and in diameters is up to 12 per year.
E3301 ANADOLU TBM has been designed exclusively for use in excavations aimed at tunneling operations. It has also auxiliary equipment that is required during the excavation of the TBM. The first TBM and rolling stock design and manufacture completed in approximately 40 weeks.
- Length: 92 m
- Power : 800 kVA
- Torque : 534 – 981 kNm
- Jacking Force : 10889 kN