The monitoring sub station should be built in the near sample source (discharge or channel) position to reduce delay analysis.The monitoring sub station area should be greater than 10 m 2 。The instrument was placed on the ground should be tiled, and the level of requirements for ground leveling, corrosion resistance, no vibration.The instrument should be higher than the ground sampling port 300mm above the ground, to ensure that the cloth pipe shall not be convex or concave. The monitoring sub station near the sewage side wall ( refer to 4.3),According to section 4.2.3.2.2 required to open the corresponding hole, and pre laid pipe required( refer to 4.5).The most widely used is the color plate, color plate has the advantages of construction speed, low cost,beautiful appearance and no decorative
Features
The unique design makes this products compared to similar products with lower failure rate, lower maintenance,lower reagent consumption and higher cost.
Injection components: vacuum suction peristaltic pump, and the pump tube between the reagent there is always an air buffer, to avoid corrosion of the tubing, while making reagent mixing more concise and flexible.
Sealed Digestion components: high –temperature high-pressure digestion system, accelerating the reaction process, to overcome the volatile corrosive gas exposure system equipment corrosion.
Reagent tube: imported transparent modified PTFE hose, diameter greater than 1.5mm, reducing the chance of water-like particles clogging.
Technical Parameters
1. A method based on : the national standard GB11914-89