The units have five working stations: three for mechanical cap forming and the other two for compound lining and centrifugation.
1.Calibration and Pre-curling
Set the position of the shell cupping process and start to curl the cup.
2.Curling
3.Forming
4.Lining
5.Centrifugation
It rotates in opposite direction with respect to the previous station to break the tendency of the compound to flow in the same direction and give a better distribution of material with less compound.
Introduction Of Equipment :
The units have five working stations: three for mechanical cap forming and the other two for compound lining and centrifugation.
1.Calibration and Pre-curling
Set the position of the shell cupping process and start to curl the cup.
2.Curling
3.Forming
4.Lining
5.Centrifugation
It rotates in opposite direction with respect to the previous station to break the tendency of the compound to flow in the same direction and give a better distribution of material with less compound.