FAM crawler-mounted conveyor bridges were specifically designed for a continuous dynamic operation to streamline the technological process of piling the ore, reclaiming leached stockpiles and creating new ore stockpiles space-efficiently and in a timely manner.
Besides their regular productive deployment in transportation of copper and nickel ores for the dynamic leach-pad systems, FAM mobile crawler-mounted conveyor bridges have been found to be perfectly suitable for a different purpose at landfills for red mud tailings which are created in the extraction of aluminum oxide from the aluminum-containing ore.