Gas turbine 6B
for power generationcombined-cycle

Gas turbine - 6B - GE Gas Turbines - for power generation / combined-cycle
Gas turbine - 6B - GE Gas Turbines - for power generation / combined-cycle
Gas turbine - 6B - GE Gas Turbines - for power generation / combined-cycle - image - 2
Gas turbine - 6B - GE Gas Turbines - for power generation / combined-cycle - image - 3
Gas turbine - 6B - GE Gas Turbines - for power generation / combined-cycle - image - 4
Gas turbine - 6B - GE Gas Turbines - for power generation / combined-cycle - image - 5
Gas turbine - 6B - GE Gas Turbines - for power generation / combined-cycle - image - 6
Gas turbine - 6B - GE Gas Turbines - for power generation / combined-cycle - image - 7
Add to favorites
Compare this product
 

Characteristics

Type
gas
Applications
for power generation
Other characteristics
combined-cycle
Rated power kW

45,000 kW, 70,000 kW, 141,000 kW
(61,182.95 hp, 95,173.48 hp, 191,706.58 hp)

Efficiency

33.4 %, 51.9 %, 52.4 %

Description

Its ability to operate in island mode, coupled with multiple decades of proven rugged performance, make the 6B.03 an excellent solution for remote installations and extreme operating conditions. The rugged, reliable 6B.03 heavy-duty gas turbine is a popular choice for refineries, natural gas liquefaction power, CHP applications, and industrial power. 6B.03 gas turbine features and benefits With proven and tested performance, and more than 55 million operating hours, the 6B.03 provides cost-effective power you can count on. World-class performance and dependability With more than 1,200 6B.03 units installed since 1978, the world has come to trust its dependability. Leading fuel flexibility Since it can be operated on a wide range of gas or distillate liquids, the 6B.03 gas turbine allows for the use of the most economically available fuel. Standard combustion supports heavy oils, naphtha, bioethanol, methanol, synthetic gases, and steel mill gases and capable of up to 100% hydrogen, or heavy fuel oil with up to 200 ppm vanadium. DLN combustion supports low-cost gas and liquid fuels, including process gases, low calorific gases, and up to 30% hydrogen, 50% ethane, 100% propane, and 50% nitrogen. Easy installation Standardized architecture and pre-assembled packaging with accessories allow for a delivery cycle of close to 10 months from contract signature to commercial operation.

VIDEO

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.