With over 450 units deployed to more than 40 countries, GE has the largest operating and most experienced OEM F-class fleet in the world. Our 9F gas turbine delivers consistent performance and accommodates a diverse range of fuels, making it great for a variety of combined cycle and CHP applications.
Three models: 9F.03, 9F.04, & 9F.05
The rugged 9F.03 and 9F.04 gas turbines deliver efficiency, flexible operation, and reliability—and the eight-month delivery cycle gets you up and running fast.
Meeting the demand for cleaner, reliable, cost-effective power, the 9F.05 heavy-duty gas turbine provides GE’s most advanced F-class technology for 50 Hz applications.
GE’s 9F turbine three-stage hot gas path
All 9F gas turbines feature a three-stage hot gas path (HGP). Every 9F gas turbine has Advanced Gas Path features, and improved materials provide cooling and longer parts durability.
Improved operational flexibility
The 9F.05 gas turbine is well-suited for combined cycle applications, with high reliability and availability, and offers turndown to 35% of baseload within emissions compliance.
The 9F.03 and .04 feature faster start times—up to 20 minutes in simple-cycle and 30 minutes in combined-cycle—along with better availability and high fuel flexibility, as well as improved survivability from grid disruptions and load transients.