Designed for flexibility in your plant layout
GE’s range of condenser technologies have meet highest performance requirements (outperforming HEI standard by up to 30 %)—and feature highly compact tube bundle designs.
Meeting each site’s requirements
GE condensers are designed for each specific installation, meeting sustained high-performance requirements, enhancing reliability, adapting to varied site cooling conditions, and providing simplified construction with pre-assembled modules.
Condensers are delivered as fully tubed modules, so that little welding is required on site. The condenser houses the first two stages of low-pressure heaters for simplified arrangement of the turbine building.
Higher performance and reliability
Features a patented tube bundle design (the Daisy bundle) and a track record of outstanding performance over the past 50 years.
Greater efficiency
Includes highly efficient tube bundles that are scaled to meet the needs of any size power plant.
Robust design for flexible operation
Designed to handle turbine and steam generator overloads and variations in cooling water temperature. It is resistant to both impingement erosion and tube vibration.