Civil engineering grout plant IS-33-E
for geothermal applicationfor tunnel

Civil engineering grout plant - IS-33-E - GERTEC - for geothermal application / for tunnel
Civil engineering grout plant - IS-33-E - GERTEC - for geothermal application / for tunnel
Add to favorites
Compare this product
 

Characteristics

Applications
for civil engineering, for geothermal application, for tunnel
Capacity

2 m³/h
(70.63 ft³/h)

Pumping pressure

12 bar, 16 bar
(174 psi, 232.1 psi)

Description

Technical Data / Performance Data • Effective mixer volume : 100 l • Mixing water minimum : 35 l • Mixer filling level (bag loading) : 850 mm • Buffer tank volume : 150 l • Flow rate approx. 40 l/min • Solids grain size : max. 2 mm • Pressure connection : VT 1“; type 25 mortar coupling VT 1“, alternatively 1“IG • Water connection : Storz C 1 ¼“ standard coupling DIN14307, max.6 bar; or Geka-claw coupling • Cleaning connection : DN 25 Geka-claw coupling • Power connection : CEE-plug 16 A, 5-pole with phase inverter • Power input 4,5KW • Voltage : 400 V; 50 Hz • Working dimensions : 1,44 x 0,71 x 1,43 m ( L x W x H) • Weight approx. 240 kg Application areas: • Geothermal application (peripheral filling for geothermal probes) • Well construction (seal water sealing, backfilling) • Tunnelling (delivery and injection of slurries, cavity filling) • Special civil engineering (delivery and injection of slurries, cavity filling) Mixing of: • Filling materials for peripheral filling • Cement slurries • Bentonite slurries • Mineral insulating slurries • Fly ash slurries

Catalogs

No catalogs are available for this product.

See all of GERTEC‘s catalogs
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.