Civil engineering grout plant IS-35-E
for geothermal applicationfor tunnel

civil engineering grout plant
civil engineering grout plant
Add to favorites
Compare this product
 

Characteristics

Applications
for civil engineering, for geothermal application, for tunnel
Capacity

3 m³/h
(105.94 ft³/h)

Pumping pressure

50 bar
(725.2 psi)

Description

Technical Data / Performance Data • Effective mixer volume 150 l • Mixing water minimum 50 l • Mixer filling level (bag loading) 1000 mm • Buffer tank volume 200 l • Flow rate speed 1 approx. 32 l/min • Flow rate speed 2 approx. 65 l/min • Solids grain size max. 2 mm • Pressure connection VT 1“; type 25 mortar coupling VT 1“,alternatively 1“IG • Water connection Storz C 1 ½“ standard coupling DIN14307, max.6 bar; or Geka-claw coupling • Cleaning connection DN 25 Geka-claw coupling • Power connection CEE-plug 32 A, 5-pole with phase inverter • Power input 12,3 KW • Voltage 400 V; 50 Hz • Transport dimensions 1,62 x 0,82 x 1,44 m ( L x W x H) • Working dimensions 2,21 x 0,82 x 1,44 m ( L x W x H) • Weight approx.445 kg Application areas: • Geothermal application (peripheral filling for geothermal probes) • Well construction (seal water sealing, backfilling) • Micro tunnelling (injection, grouting, cavity filling) • Special civil engineering (injection, grouting, cavity filling) • Road works (backfilling, drainage asphalt) Mixing of: • Filling materials for peripheral filling • Cement slurries • Bentonite slurries • Mineral insulating slurries • Fly ash slurries • Anchor grout

VIDEO

Catalogs

No catalogs are available for this product.

See all of GERTEC‘s catalogs
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.