Civil engineering grout plant IS-35-H
for geothermal applicationfor tunnel

Civil engineering grout plant - IS-35-H - GERTEC - for geothermal application / for tunnel
Civil engineering grout plant - IS-35-H - GERTEC - for geothermal application / for tunnel
Add to favorites
Compare this product
 

Characteristics

Applications
for civil engineering, for geothermal application, for tunnel
Capacity

3 m³/h
(105.94 ft³/h)

Pumping pressure

50 bar
(725.2 psi)

Description

Technical Data / Performance Data • Mixing capacity (20 batches/h) 3,0m³/h • Effective mixer volume 150 l • Mixing water minimum 50 l • Mixer filling level (bag loading) 1000 mm • Buffer tank volume 200 l • Flow rate 0-55 l/min continuous • Solids grain size max. 2 mm • Pressure connection VT 1“; type 25 motar coupling VT 1“,alternatively 1“ IG • Water connection Storz C 11/2“ standard coupling DIN14307, max.6 bar; or Geka-claw coupling • Cleaning connection DN 25 Geka-claw coupling • Dynamic pressure leakage oil line max. 1,5 bar • Required quantity of oil (on site) 70 l/min • Required oil pressure (on site) 180 bar • Transport dimensions 1,62 x 0,82 x 1,6 m ( L x W x H) • Working dimensions 2,21 x 0,82 x 1,6 m ( L x W x H) • Weight approx.385 kg Application areas: • Geothermal application (peripheral filling for geothermal probes) • Well construction (seal water sealing, backfilling) • Tunnelling (delivery and injection of slurries, cavity filling) • Special civil engineering (delivery and injection of slurries, cavity filling) • Road works (delivery of drainage asphalt) Mixing of: • Cement slurries • Filling materials for peripheral filling • Bentonite slurries • Mineral insulating slurries • Fly ash slurries • Anchor grout

Catalogs

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.