Environmental test chamber BTS series
for rapid temperature cyclingthermal shockon casters

Environmental test chamber - BTS series - Guangdong Bell Experiment Equipment Co., Ltd - for rapid temperature cycling / thermal shock / on casters
Environmental test chamber - BTS series - Guangdong Bell Experiment Equipment Co., Ltd - for rapid temperature cycling / thermal shock / on casters
Environmental test chamber - BTS series - Guangdong Bell Experiment Equipment Co., Ltd - for rapid temperature cycling / thermal shock / on casters - image - 2
Add to favorites
Compare this product

Characteristics

Test type
environmental, for rapid temperature cycling, thermal shock
Configuration
on casters
Options and accessories
3-zone
Other characteristics
stainless steel
Temperature

Max.: 150 °C
(302 °F)

Min.: -65 °C
(-85 °F)

Length

Max.: 2,350 mm
(92.52 in)

Min.: 1,860 mm
(73.23 in)

Width

1,320 mm, 1,450 mm, 1,550 mm, 1,800 mm, 2,000 mm
(52 in, 57.1 in, 61 in, 70.9 in, 78.7 in)

Depth

Max.: 2,300 mm
(91 in)

Min.: 1,420 mm
(56 in)

Description

DGBELL’s Thermal Shock Environmental Test Chamber (3 Zone) consists of the Test Zone, Heat Storage Zone and Cold Storage Zone. The specimen stays in the test zone, hot and cold air will blow from the storage zones to achieve rapid temperature change for thermal shock. Feature: 1. Faster temperature change rate. 2. Quick temperature recovery, available for faster shock cycle. 3. Cable port available for data acquisition. 4. RS485 communication, Ethernet, available for computer remote control 5. Programmable Standard Compliance: • IEC68-2-1 Environmental testing – Part 2: Test methods – Tests A: Cold • IEC68-2-2 Environmental testing for electric and electronic products Test methods – Tests B:Dry Heat • MIL-STD-810D Environmental test methods and engineering guidelines Performance parameters: Temp. Recovery Time: ≤5mins High low Temp. Exposure Time: <30 mins Temp. Fluctuation: ≤±0.5℃ Internal Material: 1.2mm thick SUS#304 high &low temperature resistance stainless steel. External Material: Adopt flame retardant high strength PU Polyurethane foam insulation material. Control Method: Touch screen programmable PLC, with USB interface, with RJ485 interface can be connected to computer controlling, special network control software, convenient remote monitoring, data acquisition.

Other Guangdong Bell Experiment Equipment Co., Ltd products

Thermal Shock Environmental Test Chamber

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.