Model Unit HEB70V HEB80V HEB81V HEB100V HEB120V
Suitable Excavator ton 13~18 18~26 18~28 28~35 33~48
Gross Weight kg 1,300 1,850 1,910 2,480 3,160
Required Oil Flow l/min 90~120 130~150 120~180 150~190 190~250
Oprerating Pressure bar 150~170 160~180 160~180 160~180 170~190
Setting Pressure bar 210 210 210 230 240
Tool Shank Diameter mm(inch) 120 (4.72) 135 (5.31) 140 (5.51) 150 (5.91) 160 (6.3)
Impact Rate bpm 400~900 400~800 350~750 350~700 300~600
Back Head N2 Pressure bar
kg/㎠ 6±0.5 6±0.5 16±0.5 6±0.5 8±0.5
Accumulator
N2 Pressure bar
kg/㎠ 60±0.5 60±0.5 60±0.5 60±0.5 60±0.5
Hose Diameter inch 1 1 1 1 1¼
Valve Location Outer Outer inner Outer Outer