HD deluge cabinet D-Pack are integrated skids, giving an advantage of easy, fast and convenient installation of deluge systems on site.
•UL Listed Modular Cabinet
•Aesthetically pleasing appearance
•All gauges externally visible through transparent polycarbonate window
•All side panels easily removable for ease of maintenance
•Comes with downstream, upstream and by pass butterfly valves
•14 SWG cabinet red powder coated
•Pressure switch, solenoid valve mounted, pre-wired & terminated into junction box
Models D-PACK and DSK are integrated deluge skid systems. DSK is pre-assembled open skid mounted on frame, while D-PACK is cabinet mounted. The entire package is pre wired and all water connections have flanged ends to provide minimal installation time. The package includes inlet, outlet, bypass valves, pressure switches, solenoid valve, common drain and flanged connection for detection network.
FEATURES
• Professionally pre-assembled and factory tested
• UL Listed modular package
• Quick and convenient installation
• Internally wired
• Cost effective and reduced installation time
• Compact, asthetically pleasing appearance
INSTALLATION
1. Place the skid at the desired location on the proper
foundation and secure it with the anchoring bolts.
2. Connect the water inlet and system piping.
3. Connect the common drain connection to an
open drain.
4. Do not restrict or reduce the drain piping.
5. Connect the detection network piping
6. Complete the field wiring of junction box.
7. Refer to appropriate deluge valve catalogue
for valve commissioning, installation and
troubleshooting instructions.