HYDRAULIC PLAFTOM WITH ELEVATION
If there is space in the warehouse and there is no possibility to make a big drill in the access to the building and the floor level of the trailer is raised by less than 800mm in relation to the warehouse floor, a hydrobridge with a trestle is used and is ideal for this.
https://youtu.be/UJNPn-ECF5c