In a photovoltaic plant, the power plant control systems are increasingly fast, precise and demanding. For this reason, the communications network is a key factor in order to guarantee a correct solar plant operation. The distribution of the inverters in the communications network depends on many factors, such as the land’s variability, the electric connection, the number and rated power of inverters, etc.Thus, it is crucial to perform correct power plant sizing and design from the beginning.
Power plant controllerIngeteam’s power plant controller features a control algorithm with response times of less than 10 miliseconds, thanks to which it can develop a precise and effective control of the active and reactive power injected to the gri