Hydraulic turbine TPS
for power generationverticalPelton

Hydraulic turbine - TPS - IREM SPA - for power generation / vertical / Pelton
Hydraulic turbine - TPS - IREM SPA - for power generation / vertical / Pelton
Hydraulic turbine - TPS - IREM SPA - for power generation / vertical / Pelton - image - 2
Hydraulic turbine - TPS - IREM SPA - for power generation / vertical / Pelton - image - 3
Hydraulic turbine - TPS - IREM SPA - for power generation / vertical / Pelton - image - 4
Hydraulic turbine - TPS - IREM SPA - for power generation / vertical / Pelton - image - 5
Hydraulic turbine - TPS - IREM SPA - for power generation / vertical / Pelton - image - 6
Add to favorites
Compare this product
 

Characteristics

Type
hydraulic
Applications
for power generation
Other characteristics
vertical, Pelton
Rated power kW

Min.: 3 kW
(4.08 hp)

Max.: 550 kW
(747.79 hp)

Head

Min.: 30 m
(98'05" )

Max.: 550 m
(1804'05" )

Description

Certifications - 2006-42-CE (Machinery Directive); 2014-35-UE (LVD); 2014-30-UE (EMC) Flow range - 2-400 l/s Number of nozzles - 6 Flow regulation - on/off valves by electrical drive for flow regulation Generator - synchronous, brushless, self-exited, three-phase (possible connection SINGLE-PHASE charges) Generator class insulation/temp. rise - H/B Bearing of generator - lifetime lubricated / with grease-gun Frequency - 50-60 Hz Voltage - 230/400V – 277/480V Protection grade - IP23 OPTIONALS ON/OFF VALVES MANUALLY OPERATED NEEDLE VALVE FOR LINEAR FLOW REGULATION DRIVEN BY ELECTRIC ACTUATOR NEEDLE VALVE FOR LINEAR FLOW REGULATION OPERATED MANUALLY PTC TEMPERATURE SENSORS IN WINDINGS GENERATOR PT100 TEMPERATURE SENSORS IN WINDINGS GENERATOR PT100 TEMPERATURE SENSORS IN BEARINGS GENERATOR VIBRATION SENSOR
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.