• Pressurized components adopts superior alloy Steel with good strength and impact toughness.
• Door seal of the high pressure BOP uses combined seal, which has better seal from the well pressure.
• Use floating or intégral gâte, can seal safely and change conveniently.
• Use buriel-type oil passage, Bearing hinge is separated from the hydraulic hinge.
• Hinge structure is simple, easy to dismount and mount.
• Use big arc-type shell on both sides of the chamber, and transit by arc-type ail around, to reduce the peak stress of the shell under pressure.
• With compact structure, smaller than similar foreign products.
• The internai shell of BOP résistant to low température can process pipeline, to make the steam flow inside the BOP, radiat heat.
Ram Assembly
• Pipe Ram
1. Top seal 2. Front seal 3. Ram body
HF type Ram assembl
1. Ram body 2. Boit 3. Ram boit 4. Ram rubber
5. Clamp holder
Ram assembl
1. Top seal rubber 2. Front seal rubber 3. Ram body
4. Clamp holder 5. Ram bolt
H type Ram assembly
Shear Ram
Shear ram can eut pipe the well, blindly close the wellhead, and also used as blind ram when there is no pipe in the well. The installation of shear ram is the same with the original ram.
• In the normal condition used as blind ram, in case of emergency, used as shear ram.
•Shear damper can be repeatedly eut pipe and not damage the blade, The weared the blade can be - reused - after the - repair. - Shenkai produces the shear ram with shear life in more than five times, Allowed to replace the sealing rubber.
•The ordinary ram blade is integrated with the ram body.