MEVA’s new Mammut XT system is setting new standards in building construction and civil engineering. Large-area formwork has never been this flexible and easy to use – with 30% less formwork time and significantly fewer components, it’s high-performance, efficient and cost effective.
Every construction site is unique, and the formwork requirements vary from project to project. Thanks to the smart combination tie hole recessed in the frame, select between three tying methods with a flick of the wrist, saving time and effort.
The flush integrated combination tie hole also enables the panels to be stacked without having to remove parts beforehand. Mammut XT panel dimensions and the symmetrical inner tie holes result in a uniform tie hole pattern and a uniform joint pattern for the highest-quality aesthetically pleasing architectural-concrete requirements.
The Mammut XT panels have solid plastic alkus facing, which has all the positive properties of plywood as well as a longer lifespan, greater load bearing capacity, better nail-holding ability, fewer and easier repairs and 100% recyclability.
The XT taper tie rod and single-sided tying achieves fast construction with lower labour costs. You save the use of flange nuts, grooved tubes, tools and scaffolding on the initial formwork side, carrying out your work in just a few steps.
To change the tie position or remove the XT sealing cones, all you need is the combi-lever instead of expensive special tools or attachments. Practical assembly lock holders mean you’ll achieve more efficient construction processes through simplified logistics.
Universal application in industrial construction and civil engineering