Robotic handling solution of large metal parts for the production of cantilevers for solar panels.
PROJECT DESCRIPTION
This project asked for a solution capable of manipulating and positioning large parts. For this purpose, two 28m long lines were developed where 8 special frames would be applied. This set of structures allowed the manipulation and positioning of parts to produce cantilevers. This system also had mounting and measuring systems with fixation systems included.
MAIN SOLUTION COMPONENTS
2 lines of 28m in length;
8 special gantries;
Mounting and measuring system;
Fixation System.