Mobile scaffolding made of sturdy aluminium tubing with welded frame parts for working heights of up to 6.10 m
For lower workplaces, the scaffolding can also be assembled at lower heights
Can be quickly and safely assembled and disassembled by just one person (used by two) using the 3-T method from level to level
Tool-free assembly thanks to push-fit connectors and quick-release connectors
Easy to handle thanks to individual lightweight parts
Space-saving transport and storage, as individual parts can be stacked compactly into each other and used as a trolley
Excellent flexibility and stability, thanks to fold-out triangular outrigger with swivel base – also ideal for wall mounting or moving in narrow passages
Four Ø 125 mm swivel castors with centric load application and spindles
Aluminium toe boards and powder-coated railing frames with integrated knee rail as a safety railing
GS-tested as per DIN EN 1004
Load class/scaffolding group 3: 2.0 kN/m²
Corporate certification: ISO 9001
Corporate certification: EN 1090
Corporate certification: EcoVadis
RoHS
REACH
The MUNK Group complies with a Code of Conduct
The Supply Chain Act does not apply due to our size
The materials used are listed in the technical specification
Resource-saving production: own photovoltaic systems