NAFFCO package fire pump system consists of pumps, driver, controllers, and accessories mounted on a common base frame. High quality UL / FM certified components are used in these systems. This engineering packaged pump meets various requirements for such pumps as detailed in Packaged Fire Pump Assemblies section of NFPA 20.
All necessary wiring between controllers and drivers is done at the factory prior to shipment. The automatic air release valve, casing relief valve, suction gauge & discharge gauge is mounted on fire pumps and other accessories are mounted on pre-constructed interconnecting piping as required by NFPA 20. Pressure sensing lines are pre-installed on Electric, Diesel, and Jockey Controllers as per NFPA 20 requirements.
These systems are subjected to rigorous performance tests at factory as per UL, FM & NFPA standards to ensure proper performance of the system as per the design requirements. For completing the installation of these pre-engineered ‘ready to install’ packages the installing contractor only needs to grout the structural base, connect the suction & discharge pipes and incoming power.
ADVANTAGES
• Comparably less project site space requirement
• Easy field installation
• Shortened installation time.
• Reduced on-site labour cost.
• Trouble free commissioning
• Optimum inside free space allocation
• Single unit responsibility
• Single manufacturing source
• Pre-connected internal piping
• Complete equipment on single base
• Perfect system operational integrity
• In-built auxiliary systems as per NFPA standard
• Convenience in obtaining parts and services.
• Certified major components
• Assured compliance with NFPA 20