NAFFCO package fire pump system consists of pumps, driver, controllers, and accessories mounted on a common base frame. High quality UL / FM certified components are used in these systems. This engineering packaged pump meets various requirements for such pumps as detailed in Packaged Fire Pump Assemblies section of NFPA 20.
All necessary wiring between controllers and drivers is done at the factory prior to shipment. The automatic air release valve, casing relief valve, suction gauge & discharge gauge are mounted on fire pumps and other accessories are mounted on pre-constructed interconnecting piping as required by NFPA 20. Pressure sensing lines are pre-installed on Electric, Diesel, and Jockey Controllers as per NFPA 20 requirements.
These systems are subjected to rigorous performance tests at factory as per UL, FM & NFPA standards to ensure proper performance of the system as per the design requirements. For completing the installation of these pre-engineered ‘ready to install’ packages the installing contractor only needs to grout the structural base, connect the suction & discharge pipes and incoming power.
ADVANTAGES
• Easy to install fire pump set at site.
• Easy to commission.
• Reduced installation time.
• Pre-wired electrical connections.
• Less space requirement.
• All (pumps, drivers & controllers) on single base.
SECURITY
• Single manufacturing source.
• Single unit responsibility
• 100% system operational integrity.
• 100% secure system.
• Convenience in procuring spare parts.
• All major components listed products.
• Complying with NFPA 20