It can be carried in front of the press machine and installed/removed by using a overhead crane, forklift and hand pallet truck. 1 set of pre-roller stand is applicable for multiple press machines.
It takes 45 min. to complete a die change by using pre-roller stand while it takes 180 min. to change a die by pre-roller .
Numbers of operators can be reduced from 5 to 2 and die change can be performed securely.