ROBOFIX POSITIONING SYSTEM FOR FLANGE PIPE / TEMPLATE PIPE MANUFACTURING
AUTOMATED FITTING PIPE PRODUCTION
When manufacuring pipes with flange connections the planes and hole patterns of the flanges at the ends of a flange pipe or a template pipe must exactly correspond with the flanges of the pipes on the jobsite where the additional pipe has to be inserted. Already small deviations can prevent the template pipe to be mounted correctly into the existing pipe network.
INSIGHT ROBOFIX
POSITIONIERSYSTEM ZUM LAGERICHTIGEN FLANSCHHEFTEN VON PASSROHREN
By means of the ROBOFIX System the position of the flanges can be precisely simulated at the workshop, so that the distance and alignment of
the flange planes and the hole pattern correspond exactly to the actual installation situation on the construction site. Positioning of the flanges can be executed using the geometrical data previously generated on site through isometric sketching by the SCOPELINK measuring system. The required pipe can be produced by an assembly of segments or by bending, it has to be positioned between the flanges and fixed to them by tack-welding. The quality assurance of the whole operation is carried out by the ROBOFIX System which controls continuously the accuracy of flange positions and pipe courses.
Grundausstattung / Eigenschaften
Hochpräzise räumliche Positionierung der Anschlussflansche für ein Passrohr entsprechend der vor Ort aufgemessenen Einbausituation
unter Berücksichtigung von Winkellage und Lochbild
Direkt Übernahme der mit dem SCOPELINK Isometriersystem ermittelten Positionierungsdaten
Traverse mit präziser Linearführung, über Servomotoren angetrieben