Hot water boiler is made of DIN- EN 10025-94 and husk burning room is made of GG20 material. Control panel is assembled on boiler with thermostat control. Feeding of the boiler is supplied with the help of a spiral automatically by carrying dry husk from husk bunker to the burning room.
The packed heat exchanger system next to boiler supplies water at 35- 40°C to the system without wasting water inside the boiler. Packed heat exchanger system includes water softening equipment inside which prevents to become calcareous.