Connection: In BSPP cylindrical gas with counterbore for sealing ring.
Commissioning:
To ensure correct operation, air in both cylinder chambers should be purged by loosening the fittings, oil unpressurized. When the fluid is free of emulsion, retighten the fittings.
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.