video corpo

Excavation trench shoring system 650

Excavation trench shoring system - 650 - SBH Tiefbautechnik
Excavation trench shoring system - 650 - SBH Tiefbautechnik
Excavation trench shoring system - 650 - SBH Tiefbautechnik - image - 2
Excavation trench shoring system - 650 - SBH Tiefbautechnik - image - 3
Add to favorites
Compare this product
 

Characteristics

Specifications
for excavation

Description

The Drag Box has been designed for trench shoring projects in open terrain and with stable soils, and only secures a small area for laying the pipes. The end faces remain unshored, and must be sloped according to ground conditions. Further excavation of soil takes place ahead, and the Drag Box is pulled through the excavated trench to the new working position. The area behind the box is filled and compacted, while pipe laying occurs in the area protected by the shoring plates. Recommended In open terrain No pipes/cables crossing Where it cannot be affected by buildings and physical structures Where it cannot be affected by roads or thoroughfares and away from endangered cables In temporary stable soils In dry ground With mechanical compacting from above When settlement can be accepted

Catalogs

No catalogs are available for this product.

See all of SBH Tiefbautechnik‘s catalogs
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.