With this slide rail system, the shoring plates are only inserted into one guide. This enables shoring depths of up to maximum 3.80m.
Just like all rolling strut systems, when laying longer pipes, the rolling struts can be arranged so their heights are offset, enabling the pipes to be pitched in.
These are primarily used for medium-sized trench constructions with high strut clearances and in environments where there is the risk of settling. Using a soil support enables even larger strut clearance heights to be realised, and our clamping device even enables you to realise strut-free trench shoring pits.