light fittings
Ready for the future
When is the right time to implement a light management system?
Right at the replacement of the conventional lighting installation, or should one rather wait a few more years?
Perhaps financial resources are not available at the time of the replacement, or one might want to start with a small test installation to gain experience.
There is no unique answer to this question. But no matter how you decide, one thing is for sure: if standard light fittings have been installed, a simple backfitting or conversion to a light management system is no longer possible.
At this point the concept of „Ready for Light Management Systems“ (RFL) comes in!
Ready for Light Management Systems
You have the choice - you determine the timing!
The Ready for Light Management Systems (RFL) light fittings keep all options open and are prepared for retrofitting sensors and light management components. One or two Zhaga-compliant sockets integrated in the housing enable the subsequent, tool-free installation of the necessary components such as controllers, radio antennas and sensors. The use of autonomous sensors without connection to a light management system is also possible at any time.
Due to standardization the sockets according to Zhaga
Book 18, you are not tied to a specific light management system. You can freely choose from all manufacturers who also use standardized Zhaga socket connections. If you choose the LIMAS System, RFL light fittings with HUB can also be combined with LIMAS light fittings. The underlying system of the light fittings is then the same - installed permanently (LIMAS) and retrofitted with HUB on site (RFL).