video corpo

Fixed crane
cable systembuildingelectric

Fixed crane - Seba Hydrometrie GmbH & Co. KG - cable system / building / electric
Fixed crane - Seba Hydrometrie GmbH & Co. KG - cable system / building / electric
Fixed crane - Seba Hydrometrie GmbH & Co. KG - cable system / building / electric - image - 2
Fixed crane - Seba Hydrometrie GmbH & Co. KG - cable system / building / electric - image - 3
Fixed crane - Seba Hydrometrie GmbH & Co. KG - cable system / building / electric - image - 4
Fixed crane - Seba Hydrometrie GmbH & Co. KG - cable system / building / electric - image - 5
Add to favorites
Compare this product
 

Characteristics

Configuration
fixed
Structure
cable system
Operating environment
building
Other characteristics
electric
Max load at max radius

100 kg
(220 lb)

Hoisting speed at max load

5 m/s
(16.404 ft/s)

Description

LAWA-guidelines-compliant and robust stationary cable crane system for water impellor equipment with ballast weights of up to 100 kg High-performance double winch type SDW-ES with a steplessly adjustable 1.5 kW, 230 VAC electric motor for adjusting speeds of 0-0.5 m/s and electrically switchable coupling (SDW-ESM) Comfortable, external operator terminal in two different versions (e.g. with an integrated counting device) Optionally available with clamped circuit tension (SKA-S), hydraulic pretension (SKA-H) or weighted tension (SKA-G) of the suspension cable and shift cable Benefits Reliable, robust, proven: SEBA cable crane systems of countless types (location/customer specific designs) have been operated successfully for decades. Users around the world have come to appreciate in particular the reliability and ease of operation. Both double-acting winches and all system components comply with the current LAWA guidelines. Everything from a single source: By working together with our customers in close consultation, in consideration of the width of the measuring station, budget and local regulations, we carry out the best suited design and configuration of the system. The cable force calculations, power supply, drilling plans, floor plans, etc. are all prepared for the consultant engineering office, the structural engineer and the building contractor. Once the gauge house and girders are in place, the installation of the system components and cables, as well as a final test run, are conducted by our experienced SEBA technicians. The SKA is ready-to-use once the entire system has been tested and approved by a local regulatory body.

Catalogs

No catalogs are available for this product.

See all of Seba Hydrometrie GmbH & Co. KG‘s catalogs
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.