Concrete box construction mixing station is heavy circle of friends in the full research foundation, according to the current situation and demand of the domestic mixing station, a project of independent research and development of mixing station, the project won the national two utility model patents, intellectual property rights are fully owned by the company, patent No. 201520033027 respectively,
201530013238.3.
1, multi module: modular design, the main structure can be concentrated into 5 container modules;
2, fast installation: convenient installation, shorten the construction period of about 5 days;
3, good transportation: easy to move, zero loss;
4, the cost of the province: the cost of base and installation is 20%, and the period of production is shortened by 30%.
5, good environmental protection: the main building of the belt is closed, the main building has a built-in back blowing type dust removal.
6, high efficiency: aggregate belt lifting, simple safety maintenance cost low, high transport efficiency;
7, control: advanced control system configuration, meet the high precision (less than 1%) measurement and real-time monitoring requirements.