Standard equipment:
• 4 carrier bars and 8 fastening elements
• Universal discharging pot with screw connection (diameter 60-90mm)
• Installation time: 10-15 minutes, deconstruction time: 5 minutes
Further accessories optional, the conveyer for screw connection is not included in the standard equipment. Silo is pre-assembled and includes covergrid.