The Giantmix BG2 has been specially developed for biogas plants built around a large covered lagoon.
Retro-fitting is also possible.
Adjustment:
The vertical adjustment is possible through upper link.
Gas-tightness:
A rubber sealing membrane, secured by a metal ring fastened to the membrane ensures a gas-tight installation. Through the rubber seal, the agitator unit is mechanically separated from the gas membrane to prevent ripping and tearing of the membrane.
Construction:
Shaft unit with electric motor, shaft tube with bearing and sealing unit of low-maintenance modular construction.
To protect the gas storage membrane inside the bay, the propeller is fitted with a protective ring. An oil reservoir serves the lubrication and the maintenance indicator.
A mounting bracket for securing the unit to the foundation is included within the scope of delivery.
Height of the unit is set at the frame.