Safety and reliability are the guidelines pursued by Tesmec designing and manufacturing trolleys and bicycles for line maintenance and inspection. The trolleys and bicycles range is under continuous improvement and today we are proud to introduce on the market the new fast inspection trolley range, in two versions: CRM for single conductor lines and CRF suitable for two, three and four bundled conductor lines. The new fast inspection range represents the top level of safety according to the CE standard UNE-EN50374:2005 and its light design allows to climb efficiently over spacers and insulators.
CR: The construction conductor cars. The traditional range.
The CRS320, CRB300, CRT290 models are compliant with the EN50374:2004 to grant the top safety level during operations.
The light aluminium structure ensures high reliability and easy transportation and use on site.
The motorization option simplifies the operations.