When using a standard fork lift you will need 4 load cycles for load lifting as well as for setting down of the load:
• The pallet lifter PH reduces the load cycles by 50%
• The ideal material handling equipment for building construction
• Load handling equipment and protective cage in one equipment
• Complies with requirements of EN 13155 for use on construction sites
• Manual picking up of the Euro-pallet via 2 bolts