for the production of foam paint rollers
The drilled foam block is put onto the conveyor belt and pulled in by the machine.
Depending on the execution the tubes are fed into the Corona Course* from a sorting drum, and after the treatment passed on into the gluing machine.
There the glue is regularly distributed in the drill holes by several individual nozzles.
The roller inserts are automatically sorted, inserted and pasted up with the inside of the drill hole.
At the end of the machine the block is removed to dry out and for further processing.
The machine is equipped with an automatic height adjustment, which means that the glue spreading is automatically adjusted to the various heights of the blocks.
During the Corona Treatment the surface tension is increased, this means that the more economic PP or PVC tubes can be used.
Features
maximum economy
high flexibility
simple operation
high capacity
production security
very low change-over time
no spray vapour during distribution of adhesive
according to execution use of PP and PVC tubes