• Products
  • Catalogs
  • News & Trends
  • Exhibitions

Horizontal drilling rig YG-70
rotaryhydraulicconstruction

Horizontal drilling rig - YG-70 - WUXI JINFAN DRILLING EQUIPMENT CO.,LTD. - rotary / hydraulic / construction
Horizontal drilling rig - YG-70 - WUXI JINFAN DRILLING EQUIPMENT CO.,LTD. - rotary / hydraulic / construction
Horizontal drilling rig - YG-70 - WUXI JINFAN DRILLING EQUIPMENT CO.,LTD. - rotary / hydraulic / construction - image - 2
Add to favorites
Compare this product
 

Characteristics

Drilling type
horizontal
Drilling unit
rotary
Other characteristics
hydraulic
Sector
construction
Drilling diameter

Min.: 130 mm
(5 in)

Max.: 180 mm
(7 in)

Drilling depth

Min.: 70 m
(229'07" )

Max.: 80 m
(262'05" )

Overall length (working)

3,100 mm
(122 in)

Overall width (working)

1,000 mm
(39 in)

Overall heigth (working)

1,500 mm
(59 in)

Machine weight

1,400 kg
(3,086.5 lb)

Motor power

22 kW
(29.91 hp)

Description

YG-70 construction drilling rig is a full hydraulic operated top drive power head drill. It is used to drill heavy duty pretension anchor hole at side slope of water power station, railway or highway projects, as well as drainage holes. It also used to prevent or solve geologic calamity, such as landslide and rock collapse etc. In addition, it is also used to drill small sized water well and high-pressure jet grouting hole. It is already widely used in various projects such as water power stations situated in Yunnan, Guangxi, Sichuan, Guizhou and Hubei provinces, and expressways as well such as Ninbo-Taizhou-Wenzhou (in Zhejiang), Huangshan- Hangzhou (in Zhejiang), Dali-Baoshan (in Yunnan).It has become the first priority for medium-duty anchoring-reinforcing projects in China. Features ● It has great drilling capability, wide range of application, rapid drilling speed and high drilling efficiency, as well as powerful ability of eliminating accidents. ● Extension mechanism in the output spindle of top drive power head protects drilling tools effectively. It can increase the hole inclination angle range and drill elevation angle hole, while setting the top drive power head and hole top plate toward the opposite direction. ● A set of front-mounted adjustable columns on drill frame is used for adjusting the height of mast front-end, which makes it convenient to align with working position. ● Rig structure is a separate group design, and assures good disassembility , rapid and convenient mount and transport, better working environment and lower labor strength as well as remote control and operation.
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.