• Regardless of the building height, it can perform the same height, providing a complete solution for the customer.
• Various installation methods, such as direct internal climbing installation, fixed base installation, and floor or elecator shaft climbing.
• Using reinforced pipe tower structure, the deformation at the top of the tower body is reduced by 20%-25% compared to similar products, improving the accuracy of concrete placement and reducing the hose's swinging.